4 resultados para Produção enxuta

em Universidade Federal do Rio Grande do Norte(UFRN)


Relevância:

70.00% 70.00%

Publicador:

Resumo:

Considered as one of the oldest activities done by men, the civil construction represents one of the most important sectors for the economic growth of a country, in spite of the low results of growth in the past few years and also in the current year. To make this industry grow, even with an unfavourable economic scenario, it is necessary to implement an effective planning in its activities. This is one of the most important concepts brought by the Lean Construction philosophy, which had its origin through the adaptation of the concepts established by the Toyota Production System (TPS) or Lean Production. By having as a scenario the city of Natal\RN, the main goal of this dissertation consists in investigating how the 11 principles of the lean construction influenced the schedule of a construction field that started to implement its lean concepts. As a methodology, it was used the case study of a big enterprise located in Natal (RN). During the execution of the method, documents related to the short-term, midterm and long-term planning were analysed , aiming to describe its planning process; it was also described the factors that caused the delays at the enterprises’ field ;in addition, a comparison was made between the results obtained at the case study and the ones presented at the literature; in the end, the actions were listed by the company, which had the purpose to solve the main causes of delays, verifying if they were linked to the lean construction principles. This research finds its reason of existence in the relevance of its theme at the nowadays reality of the construction industry, since the principles of the lean construction uphold the reduction of processes that are useless, diminishing wastes as well as costs in construction. The relevance is perceived for the academy, in terms of the possibility to discuss if the concepts established by the lean production are being adapted to the civil construction sector and how this adaptation is influencing at the buildings planning project. Economic importance, because with the reduction of the wastes and costs, the companies may reduce the building´s value into a more accessible value, even with the sector´s lower growth. And social significance, because lean construction gives a better participation of the labour at the planning activity. Among the main results, the high frequency of planning errors stands out, mainly the programming deviations and not the task programming, as well as the execution errors, low productivity and activities executed by the workers. Amongst the 11 principles of lean construction, only five were related with the 12 actions analysed by the author. From the 12 actions, four were completely cohesive to one or more from these five principles. Some improvement proposals were also highlighted and established by the research.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In recent years, the Brazilian construction industry has gone by changes like currency stability, increasing competition, shortage of skilled labor and increasing quality importance required by the customer, who made the sector companies seek solutions through new management practices in order to become more efficient. A alternative to these management practices is known as Lean Construction which is derived from the Toyota System Production. Lean Construction main goals are to reduce parts of activities that do not add value, increase product value by considering customer needs, reduce variability and production cycle time, simplify process by reducing the number of parts or steps, increase the flexibility in the product execution and transparency process, focus the control on overall process, introduce continuous improvement process, maintain a balance between improvements in flows and conversions and seek to learn from practices adopted by competitors. However, the construction industry is characterized by having nomadic activity, which undertakes an unique product with high cost of production and big inertia for behavioral change, making it difficult to implement the philosophy of lean construction in companies. In this sense, the main objective of this study is to develop a methodology for implementation of the principles of Lean Construction. The method of implementing the proposed management system was designed with the aid of 5W2H tool, and the implementation process is divided into three phases. The first one aims to know in a macro way the current operation of construction, identify who is its target audience and what are the products and services offered to the Market. The second phase aims to describe what actions should be taken and which documents are needed to be created or modified; finally, the third step goal consists in how to control and monitor established processes, where through Strategic Planning the company goals would be set along with their respective targets and indicators in order to keep the system working, aiming for continuous improvement with focus on the customer. This methodology was conceived as a case study analyzing a medium size construction with more than 18 years of activity and certified for almost 10 years with ISO9001 and level A in PBQP-H. We also conclude that this implementation process can be used in any developer and / or builder

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The evolution of the practices and strategies of manufacturing management, over the years, has made many companies realign their production systems in order to raise their competitiveness and operational performance. However, in most cases these changes are made in a heterogeneous manner, which ends up leaving the production system without a defined goal, which may end up damaging the managerial strategies of the organization as a whole. Thus, some organizations seek to use techniques and/or successful production practices used by other companies, believing can be able to reproduce the same results. An efficient production system must be fully planned and appropriate to the strategic objectives of the organization. Thus, this paper aims to identify the manufacturing management strategies adopted in paraibanas industries, as well as identify the lean practices used by them. Thus, a qualitative study was conducted, using as methodological basis the multicase study. Were made: direct observations, semi-structured interviews and questionnaires applied to those responsible by the production sector of the participating companies. As a result, it was possible to identify the type of manufacturing management system adopted by companies. Where it was detected that Company A uses a system of Modern Mass Production with focus on productivity and low cost and the Company B is using Lean Manufacturing system focused on quality and diversity. In the two organizations was possible to realize the application of lean practices where the Company what does not use the LM, possessed lean practices in standard extremely mature of utilization.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Nowadays lives up in an era of tight credit caused by the global financial crisis, as occurred in the past, it is the responsibility of various sectors and segments of society find ways to reinvent itself. In this context, Lean Construction presents itself as a strong alternative production management for companies in the construction segment. Arising out of lean thinking that originated in Japan in the postwar period and has spread around the world in times of extreme scarcity with the oil crisis. In practice the Lean Construction is a philosophy that seeks to improve the process of production management, maximizing the value of the flow from the customer's perspective through the elimination of losses. And thrives in environments and cultures that consider the scarcity of resources like something natural, applying both the macroeconomic crisis as in times of prosperity. The Planning and Production Control - PCP presents itself as a fundamental building block for companies to protect themselves in the face of economic fluctuations, seeking for their survival and success in the competitive market. Motivated by the lack of discussion of the topic in the local academy, and for the identification of 93.33% of construction companies that do not make use of methodological tools for PCP in the state, this dissertation aims to study and propose the implementation of lean construction in methodology of planning projects implemented on construction sites. This characterized the management system, of the production of a construction company, pointing out the main causes of ineffectiveness related to consequent low performance of one of his ventures. In sequence, the PCP was implemented with the use of tools to serve the principles of lean construction. This being monitored through indicators that provided managers managerial view of process of actions control and production of protective mechanisms. All implementation guidelines and application of this management model, were exposed in a simplified way, practical and efficient, in order to break the resistance of new practices and old paradigms in the industry.